Risk Analysis of the International Construction Project
By: Paul Stanford Kupakuwana
Cost Engineering Vol. 51/No. 9 September 2009
ABSTRACT
This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong.
國(guó)際建設(shè)工程風(fēng)險(xiǎn)分析
保羅 斯坦福 庫(kù)帕庫(kù)娃娜
工程造價(jià)卷 第五十一期 2009年9月9日
摘要 此次分析用實(shí)例研究方法分析津巴布韋標(biāo)準(zhǔn)協(xié)會(huì)總部(SAZ)的屋頂部分坍塌的問(wèn)題。特別是,它審查了建設(shè)專業(yè)隊(duì)伍發(fā)揮的事先作用。分析顯示,津巴布韋標(biāo)準(zhǔn)協(xié)會(huì)總部的傳統(tǒng)建筑工程普遍具有高風(fēng)險(xiǎn)的特點(diǎn)。一個(gè)明顯失敗的跡象,是由原告所聲稱的承包商和建筑師們?cè)陬A(yù)防和/或緩解可能發(fā)生的建設(shè)問(wèn)題上是失敗的。推斷在部分屋頂坍塌之前兩者之間的缺陷應(yīng)該及早發(fā)現(xiàn)并及時(shí)糾正是合理。原告有理由對(duì)承包者和建筑師雙方帶來(lái)的疏忽索賠看來(lái)是合乎情理的。風(fēng)險(xiǎn)分析,通過(guò)多方位方法分析建設(shè)問(wèn)題的決定性查問(wèn),使有效風(fēng)險(xiǎn)管理策略對(duì)失敗建設(shè)問(wèn)題的鑒定容易。越強(qiáng)調(diào)服務(wù)的重點(diǎn),委托方的要求越來(lái)越高,挑剔越來(lái)越多,并不太愿意接受沒(méi)有賠償?shù)娘L(fēng)險(xiǎn)。委托方不想要驚喜,并且當(dāng)事情出現(xiàn)問(wèn)題更可能去訴訟。
By: Paul Stanford Kupakuwana
Cost Engineering Vol. 51/No. 9 September 2009
ABSTRACT
This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong.
國(guó)際建設(shè)工程風(fēng)險(xiǎn)分析
保羅 斯坦福 庫(kù)帕庫(kù)娃娜
工程造價(jià)卷 第五十一期 2009年9月9日
摘要 此次分析用實(shí)例研究方法分析津巴布韋標(biāo)準(zhǔn)協(xié)會(huì)總部(SAZ)的屋頂部分坍塌的問(wèn)題。特別是,它審查了建設(shè)專業(yè)隊(duì)伍發(fā)揮的事先作用。分析顯示,津巴布韋標(biāo)準(zhǔn)協(xié)會(huì)總部的傳統(tǒng)建筑工程普遍具有高風(fēng)險(xiǎn)的特點(diǎn)。一個(gè)明顯失敗的跡象,是由原告所聲稱的承包商和建筑師們?cè)陬A(yù)防和/或緩解可能發(fā)生的建設(shè)問(wèn)題上是失敗的。推斷在部分屋頂坍塌之前兩者之間的缺陷應(yīng)該及早發(fā)現(xiàn)并及時(shí)糾正是合理。原告有理由對(duì)承包者和建筑師雙方帶來(lái)的疏忽索賠看來(lái)是合乎情理的。風(fēng)險(xiǎn)分析,通過(guò)多方位方法分析建設(shè)問(wèn)題的決定性查問(wèn),使有效風(fēng)險(xiǎn)管理策略對(duì)失敗建設(shè)問(wèn)題的鑒定容易。越強(qiáng)調(diào)服務(wù)的重點(diǎn),委托方的要求越來(lái)越高,挑剔越來(lái)越多,并不太愿意接受沒(méi)有賠償?shù)娘L(fēng)險(xiǎn)。委托方不想要驚喜,并且當(dāng)事情出現(xiàn)問(wèn)題更可能去訴訟。
TA們正在看...
- 2022新時(shí)代中國(guó)特色社會(huì)主義理論與實(shí)踐題庫(kù)答案.docx
- 2013年重慶南岸中考?xì)v史真題及答案a卷.doc
- 2013年重慶南岸中考數(shù)學(xué)真題及答案a卷.doc
- 2013年重慶南岸中考數(shù)學(xué)真題及答案b卷.doc
- 2013年重慶南岸中考物理真題及答案a卷.doc
- 2013年重慶南岸中考物理真題及答案b卷.doc
- 2013年重慶南岸中考英語(yǔ)真題及答案a卷.doc
- 2013年重慶南岸中考英語(yǔ)真題及答案b卷.doc
- 2013年重慶南岸中考語(yǔ)文真題及答案a卷.doc
- 2013年重慶南岸中考語(yǔ)文真題及答案b卷.doc