xx大酒店空調(diào)工程畢業(yè)設(shè)計(jì),摘要暖通空調(diào)設(shè)計(jì)主要是對(duì)室內(nèi)熱環(huán)境、空氣品質(zhì)進(jìn)行設(shè)計(jì),但這必須在充分了解建筑對(duì)暖通空調(diào)的要求和暖通空調(diào)系統(tǒng)及設(shè)備對(duì)建筑及其它設(shè)施的影響的基礎(chǔ)上進(jìn)行設(shè)計(jì)。該建筑位于西安市,本工程為酒店空調(diào)工程設(shè)計(jì),酒店高約33米,是一座綜合性建筑物,總建筑面積為9120﹐,其中空調(diào)面積為8973﹐。酒店主樓地面10層,其中一層為商鋪,層...
編號(hào):35-232069大小:1.04M
分類: 論文>電氣自動(dòng)化/電力論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會(huì)員 wanli1988go 發(fā)布

摘 要

暖通空調(diào)設(shè)計(jì)主要是對(duì)室內(nèi)熱環(huán)境、空氣品質(zhì)進(jìn)行設(shè)計(jì),但這必須在充分了解建筑對(duì)暖通空調(diào)的要求和暖通空調(diào)系統(tǒng)及設(shè)備對(duì)建筑及其它設(shè)施的影響的基礎(chǔ)上進(jìn)行設(shè)計(jì)。
該建筑位于西安市,本工程為酒店空調(diào)工程設(shè)計(jì),酒店高約33米,是一座綜合性建筑物,總建筑面積為9120㎡,其中空調(diào)面積為8973㎡。酒店主樓地面10層,其中一層為商鋪,層高為4.5米,二、三層為雅間、多功能廳, 層高為3.2米,其余四到十層為辦公室、標(biāo)準(zhǔn)間,層高為3.2米。
結(jié)合建筑的特點(diǎn),夏天采用螺桿式冷水機(jī)組作為冷源,冬季采用城市供熱管網(wǎng)通過(guò)換熱器得到熱水,以達(dá)到節(jié)約運(yùn)行成本的目的。對(duì)于雅間、標(biāo)準(zhǔn)間等小空間采用風(fēng)機(jī)盤管加新風(fēng)系統(tǒng),每層設(shè)有新風(fēng)機(jī)組,可以由同層的新風(fēng)機(jī)組送入室內(nèi),風(fēng)機(jī)盤管獨(dú)立承擔(dān)室內(nèi)的冷熱負(fù)荷。風(fēng)機(jī)盤管的新風(fēng)供給方式用單設(shè)新風(fēng)系統(tǒng),獨(dú)立供給室內(nèi)。而對(duì)于多功能廳、商鋪等空間較大、人員較多、溫度和濕度允許值波動(dòng)范圍小的房間,采用全空氣系統(tǒng)。因?yàn)樵摼频攴块g類型繁多,各房間冷熱負(fù)荷并不相同,可以個(gè)房間進(jìn)行個(gè)別的調(diào)節(jié)。本設(shè)計(jì)空調(diào)水系統(tǒng)選擇閉式、豎直異程、水平同程式、雙管制、單級(jí)泵,變流量系統(tǒng),這種空調(diào)水系統(tǒng)具有結(jié)構(gòu)簡(jiǎn)單,初期投資小,管路不易產(chǎn)生污垢和腐蝕,不需要克服系統(tǒng)靜水壓頭,水泵耗電較小等優(yōu)點(diǎn)。
關(guān)鍵詞:空調(diào)系統(tǒng),冷負(fù)荷,水系統(tǒng),獨(dú)立新風(fēng)系統(tǒng),風(fēng)機(jī)盤管











ABSTRACT


HVAC design is mainly for indoor thermal environment, air quality in design, but construction must be fully aware of the requirements for HVAC and HVAC systems and equipment for construction and other facilities on the basis of design.
The building is located in xi'an.The project is the hotel air-conditioning engineering design .The hotel is a comprehensive building, The total building area is 9120㎡,but the air-conditioning area is 8973㎡.There are 10 floors of the building . The first floor is for shops which height of the first floor is about 4.5meters.Other layers of the building is 3.2 meters hight .The second and third layers is for Blair and the multi-function hall.And the remaining 4-10 layers is for office room and guest room.
Combine the characteristics of the construction .In summer, we use water-cooled chillers as a cold source . In winter,we use hot water pipe network of city as a source . In order to savings the operating cost. For accor and the standards room, such as small space we use the fan coil and new wind systems, There is one new air unit each layers so that fresh air can be into the indoor and fan-coil bears the indoor cooling load . Fan-coil and fresh air independent supply into room. As for the multi-function hall and shops, such as larger room, more staff, allowed temperature and humidity fluctuations in little,if you set the fan-coil water system will use more end equipments, resulting in a waste of investment. So the entire air system to be adopted. Because of the different types of hotel rooms, the room is not the same as hot and cold load can be individual rooms regulation. The design of air conditioning water systems use closed, vertical different way, the level of the same programs, dual control, single-stage pumps, variable flow system. Air-conditioning water system that is simple in structure, the initial investment, not easy to have a pipeline dirt and corrosion, the system does not need to overcome the hydrostatic pressure head, water pumps, small power consumption and so on.
KEY WORDS: air-conditioning systems, cooling load,water System, independent of fresh air system, fan coil




























目 錄

前 言 1
第1章 工程概況 2
§1.1 原始資料 2
§1.2 設(shè)計(jì)參數(shù) 4
第2章 負(fù)荷的計(jì)算 6
§2.1 夏季冷負(fù)荷的計(jì)算 6
§2.2 冬季熱負(fù)荷的計(jì)算 12
§2.3 房間散濕量 14
第3章 空調(diào)系統(tǒng)的方案確 16
§3.1 空調(diào)系統(tǒng)的劃分原則 16
§3.3 方案的確定 19
第4章 風(fēng)量的計(jì)算 21
§4.1 全空氣一次回風(fēng)系統(tǒng) 21
§4.2 風(fēng)機(jī)盤管加新風(fēng) 23
§4.3 新風(fēng)量的確定 25
§4.4 新風(fēng)負(fù)荷 25
§4.5 空調(diào)系統(tǒng)的運(yùn)行調(diào)節(jié) 26
第5章 空調(diào)設(shè)備的選擇 28
§5.1 風(fēng)機(jī)盤管 28
§5.2 新風(fēng)機(jī)組選型 28
§5.3 空調(diào)機(jī)組選型 29
§5.4 換熱器的選擇 30
§5.5 冷水機(jī)組的選擇 30
第6章 氣流組織計(jì)算 32
§6.1氣流組織的形式 32
§6.2 風(fēng)口型式的確定 32
§6.3 氣流組織設(shè)計(jì)算 33
第7章 水力計(jì)算 39
§7.1 水管水力計(jì)算 39
§7.2風(fēng)管的水力計(jì)算 44
第8章 其它設(shè)備的選擇 50
§8.1 分水器與集水器的選擇 50
§8.2 冷卻塔的選擇 51
§8.3 系統(tǒng)定壓方式 51
§8.4 水泵的選擇 52
第9章 空調(diào)系統(tǒng)的消聲、減振措施 56
§9.1 空調(diào)系統(tǒng)的消聲 56
§9.2 空調(diào)系統(tǒng)的減振 57
第10章 管道的保溫、防腐措施 59
§10.1 管道的保溫 59
§10.2 管道的防腐 60
結(jié) 論 61
參考文獻(xiàn) 62
致 謝 63
附 表 64
附表一 冷負(fù)荷匯總表 64
附表二 熱負(fù)荷匯總表 66
附表三 濕負(fù)荷匯總表 67
附錄四 新風(fēng)負(fù)荷 70
附表五 設(shè)備選型表 72
附表六 風(fēng)口選型 74
外文資料 77


參考文獻(xiàn)

[1] 趙榮義.簡(jiǎn)明空調(diào)設(shè)計(jì)手冊(cè).北京:中國(guó)建筑工業(yè)出版社,1998
[2] 郭慶堂.實(shí)用制冷工程設(shè)計(jì)手冊(cè).北京:中國(guó)建筑工業(yè)出版社,1999
[3] 周邦寧.中央空調(diào)設(shè)備選型手冊(cè).北京:中國(guó)建筑工業(yè)出版社,1999
[4] 中國(guó)有色工程設(shè)計(jì)研究總院.GB5..
欧美极品性爱15p| 欧美一级黄片视频播放| 日韩在线伊人| 欧美精品色图| 99久久麻豆一区| 91视频国产美女| 欧美大屁股在线| 午夜神马福利| 国产男女性无套免费看| 国产一区二区免费视频| 无码人妻桃色| 麻豆国产欧美一区二区三区r| 天天影视插插吧| 综合激情97| 西西www44无码视频| 色图无码老牛| 开心激情五月天| 欧美亚洲综合色图| 预约激情六月丁香| 91天堂网| 在线观看精品传媒国产| 亚洲1234在线视频| 精精国产xxxx视频在线播放 | 丰满熟妇乱又伦精品| 国产精品艹艹艹| 色欲国产麻豆一精品一av一免费| 日韩欧美一区电影| 东京热不卡2| 欧牲交a欧美牲交aⅴ| 人人莫人人| 亚洲国产肉蒲团东北| 久re视频精品| 奇米在线| 久久久久久亚洲综合影院| 亚洲人妻AV不卡| 日韩无矿砖一线二线图| 久久综合亚洲欧美成人| 色综合小雪| 偷拍视频精品一区二区| 看黄色的网站| 国产欧美中文一区|